FAQ

Frequently Asked Questions

General Questions

NFPA regulations state that a Room Integrity Test or inspection must be done annually or whenever renovations or adjustments have been made to your room.

ome issues are, enclosure leaks, A/C shutdown, wind losses, room having a size increase after install, or the height change of equipment inside a room.

All these problems are addressed by a Room Integrity Test upon initial installation and annual re-testing.

every room is different, the solution depends on how the room was designed. In most cases, adding more agent could result in a lower retention time.

Suspended ceilings are not actually recommended to be used when clean agents are installed as the fire suppressant. Suspended ceilings are often a large factor in a room’s failure and are known to increase agent loss.

There are several benefits to having the test done. Not only would the test predict a retention time for the agent, it would also control dust, noise and humidity. It also gives the opportunity to create a more energy efficient room.

By performing a Room Integrity Test, we identify all the leaks that not only would cause the suppression agent to escape, but also improve the effectiveness and efficiency of the A/C unit used to cool the room. This would result in an improved energy consumption of the A/C unit and reduction of energy cost.

After having the door fan set in place, the test itself can take as little as 15 minutes. It is necessary to be thorough and seek out all issues that may cause the room to fail.

Room Integrity Tests can be done in live rooms. Depending on the original design, we may require that A/C units be shutdown for a short period, which in most cases should not exceed a few minutes.

The cost to conduct a test can vary and is evaluated on a room to room basis. FM Engineering Inc., does however offer competitive pricing and discounts for long term contracts on annual testing.

In addition to Room Integrity Testing, FM Engineering Inc. offers yearly maintenance programs for all types of rooms. These programs usually consist of an annual Room Integrity Tests, with 24hr service for Mission Critical Facilities, CRAC units, UPS Systems, and Backup Generators.

We can customize maintenance programs specific to each company and each room.In the result of a failed Room Integrity Test, FM Engineering Inc. offers specialized sealing and repairs to neutralize issues and ensure proper procedures to get the highest possible retention time.

FM Engineering Inc.’s key specialization is in full service data centre development and management. This extensive experience ensures that no issues are overlooked when designing and/or maintaining your data room. In the event that your company should consider using FM Engineering Inc. to create your next project, all precautions are taken so that preventable situations do not arise.